Call now to speak to an industry expert +44 (0) 121 687 5850
Chiltern Rail Refurbishment Programme
In the ongoing development of our range of LED rail lighting products and services, McGeoch has been involved in a
major project to refurbish all the Mk3 Coaching Stock for Chiltern Rail. Here we take a look at the project . . .
The Project
The refurbishment of the Mk3 coaching stock for Chiltern Rail; the project
involves conversion of the ageing rolling stock and installation of modern
systems to a very high standard including an upgrade to interior LED lighting.
The Design & Modification Team
Delta Rail were commissioned for the design work and Wabtec were awarded
the contract to carry out the conversion and refurbishment work; McGeoch was
tasked to provide ceiling rafts with integrated LED lighting to compliment the
modern styled interior.
Lighting Design
The ceiling raft design comprised of a centre strip light, spot lights and downwash lighting to provide excellent illumination to
the table areas and the downwash lights provide a decorative cone of light to the luggage stowage shelves. LED step lights
were also provided along with LED lighting for the vestibules and toilet modules. The lighting design is keyed to the window
spacing’s and careful attention was made to ensure perfect colour matching between LEDs for uniformity. A battery
maintained emergency system is built into each ceiling raft and provides double the duration required in Group Standards, it
produces so much light that evacuation procedures will not be necessary during power failure; the uniformity of light
produced is a perfect score of 1.
Before (Prototype in situ)
New LED Lighting during commissioning
Refurbished Mk3 Coach in service
Summary of LED benefits:
Instant on
No flicker
Reliability
No maintenance
Power saving up to 30%
Resistance to shock and vibration
Better quality of light
Share This Blog
Lower Tower Street, Birmingham B19 3PA, UK
Telephone: +44 (0) 121 687 5850
Fax: +44 (0) 121 333 3089
Email: sales@mcgeoch.co.uk